Funnel refitted
Report and pictures by David Elms
17th April. The funnel has been refitted to the ship, the engine room
bilges painted, and the gearbox mounting plates fixed to the original engine
bearers.
The ship has been dried out on the keel blocks ready for removal,
inspection, and refitting of the tailshafts. While she is dried out, the new
propellers are to be fitted and the hull bottom painted.
Back